Saturday, October 4, 2008

Sewer Project 70% Done!

UPDATE: These pictures are of the septic sand/gravel filtering box. They are taken about 100 feet behind the ballfield campsite and almost 200 feet up in the woods toward Inspiration Point.

Jon is reporting that the sewer system at camp is about 70% done. This is a huge project for camp. Here are a couple pictures from this week's work - thanks Mr. Moody!

1 comment:

Anonymous said...

Where is this "structure" at camp?
KT